MC1425968 High
Dynamics 365 Project Operations - Configure Maximum Daily Time Entry Duration
Summary AI-generated
Admins can now configure maximum daily time entry duration in Dynamics 365 Project Operations, available starting July 24, 2026.
Written by Azure OpenAI (gpt-4.1) from the text of the post below. It can be incomplete or wrong; the original post is authoritative.
Similar posts
Search for more like this- MC1443022 Dynamics 365 Project Operations - Configure Minimum Interval of Time Entry Duration
- MC1425995 Dynamics 365 Project Operations - Enable time zone independent behavior on Time Entry Grid
- MC1411150 Dynamics 365 Project Operations - Track real project progress from field execution
- MC1265696 Dynamics 365 Project Operations - Enable configurable timescale settings on assignments view
- MC1411079 Dynamics 365 Project Operations - Create work orders from project tasks
- MC1465316 Dynamics 365 Project Operations - Use time zone-agnostic fields in resource planning
Original post from Microsoft
We are announcing the ability to configure maximum daily time entry duration in Dynamics 365 Project Operations. This feature will reach general availability on July 24, 2026.
How does this affect me?
With this feature, admins can configure the maximum time that can be logged for time entry. This configuration can be applied from the Parameters page and will be checked each time a new time entry is created or modified.
What action do I need to take?
This message is for awareness, and no action is required.
How does this affect me?
With this feature, admins can configure the maximum time that can be logged for time entry. This configuration can be applied from the Parameters page and will be checked each time a new time entry is created or modified.
What action do I need to take?
This message is for awareness, and no action is required.